Highways Issue Inspected – Enquiry 4089188

Highways Issue Inspected – Enquiry 4089188
Dear Mr Stephen Mansfield(Clerk LPC)
This is an update to your enquiry dated 15/08/2017 in relation to FOLD END LANE.
A highways inspector has now assessed the site and arranged for repairs to be carried out.
The reported issue is not considered to be a high risk to public safety and so the repairs will be grouped with similar works in the area in order to be as efficient and cost effective as possible. Currently over 50% of these repairs take place within 60 days. The remaining defects are repaired as soon as resources are available.
You will receive a further email when the works have been completed. You can also check on the progress of your report online at www.staffordshire.gov.uk/reportit
General Information about Repairs
Timescales for repairs are determined by the defect’s location, size and ultimately, the risk the defect poses to public safety.
Currently 97% of the most urgent defects are repaired within seven days. However, the majority of reported defects are inspected and categorised as non-urgent and, to be as efficient and cost effective as possible, these repairs are grouped by location and work type. Currently over 50% of these lower risk repairs take place within 60 days.