Highways Issue Inspected – Enquiry 4081257

Highways Issue Inspected – Enquiry 4081257
Dear Mr Stephen Mansfield(Clerk LPC)
This is an update to your enquiry dated 19/05/2017 in relation to FOLD END LANE.
A highways inspector has now assessed the site and arranged for repairs to be carried out.
The reported issue is not considered to be a high risk to public safety and so the repairs will be grouped with similar works in the area in order to be as efficient and cost effective as possible. Currently over 50% of these repairs take place within 60 days. The remaining defects are repaired as soon as resources are available.

Highways Issue Inspected – Enquiry 4081255

Highways Issue Inspected – Enquiry 4081255
Dear Mr Stephen Mansfield(Clerk LPC)
This is an update to your enquiry dated 19/05/2017 in relation to LEEK ROAD.
A highways inspector has now assessed the site and arranged for repairs to be carried out.
The reported issue is not considered to be a high risk to public safety and so the repairs will be grouped with similar works in the area in order to be as efficient and cost effective as possible. Currently over 50% of these repairs take place within 60 days. The remaining defects are repaired as soon as resources are available.

Highways Issue Inspected – Enquiry 4081261

Highways Issue Inspected – Enquiry 4081261
Dear Mr Stephen Mansfield(Clerk LPC)
This is an update to your enquiry dated 19/05/2017 in relation to HIGH STREET.
A highways inspector has now assessed the site and arranged for repairs to be carried out.
The reported issue is not considered to be a high risk to public safety and so the repairs will be grouped with similar works in the area in order to be as efficient and cost effective as possible. Currently over 50% of these repairs take place within 60 days. The remaining defects are repaired as soon as resources are available.
You will receive a further email when the works have been completed. You can also check on the progress of your report online at www.staffordshire.gov.uk/reportit
General Information about Repairs
Timescales for repairs are determined by the defect’s location, size and ultimately, the risk the defect poses to public safety.
Currently 97% of the most urgent defects are repaired within seven days. However, the majority of reported defects are inspected and categorised as non-urgent and, to be as efficient and cost effective as possible, these repairs are grouped by location and work type. Currently over 50% of these lower risk repairs take place within 60 days.
The repair of defects reported to the County Council form part of a much bigger highway maintenance operation across our road network. This includes a range of planned activities to ensure limited budgets are used in the most effective way. This includes: resurfacing works along roads that have reached their end of life; surface dressing roads to protect them from further deterioration; drainage renewals; and regular maintenance activities such as gully emptying and grass cutting.
More information about these activities can be found online at www.staffordshire.gov.uk/highways
Kind regards
The Highways Team

Highways Issue Inspected – Fault Report 4081259

Highways Issue Inspected – Fault Report 4081259
Dear Mr Stephen Mansfield(Clerk LPC)
This is an update to your enquiry dated 19/05/2017 in relation to BUXTON ROAD .
A highways inspector has now visited the site and added the following notes to the report:
Hedges bottom side of traffic lights are slightly overgrown i will ascertain who owns the land and write to them but I doubt that hedges will now be cut until after nesting season
If you have any queries regarding this report please contact highways@staffordshire.gov.uk quoting your enquiry number
Kind regards
The Highways Team